CONTRACT VALUE : $ 500.000
Since the existing culverts have lost their strength, speed limitations are imposed when passing over the line. Multi-plate steel corrugated culverts will be constructed instead of culverts that have lost their strength.
As CSK CONTRACT, TECHNOLOGY, CONSULTING AND COMMERCIAL INCORPORATED COMPANY, we continue to work to make the line safely operational again.
REPUBLIC OF TURKEY STATE RAILWAYS AFYON 7’TH REGIONAL DIRECTORATE
BALIKESİR - ALAYUNT RAILWAY CULVERT CONSTRUCTION WORKS
KM : 18+325, 19+201, 19+337, 20+215, 20+706, 62+091, 62+659
CONTRACT VALUE : $ 500.000
The tender for the project was made by TCDD Afyon 7th Regional Directorate. As the main contractor of the project, we will renew the existing culverts with corrugated steel culverts within the scope of the project. Since the existing culverts have lost their strength, speed limitations are imposed when passing over the line. Multi-plate steel corrugated culverts will be constructed instead of culverts that have lost their strength.
As CSK CONTRACTING, TECHNOLOGY, CONSULTING AND COMMERCIAL INCORPORATED COMPANY, we continue to work to make the line safely operational again.