An accelerated renovation has been carried out in Arifiye-Inonu section with a length of 150 km on the existing conventional line between Ankara-Istanbul.
This line has an economical importance.
Briefly, Ankara-Istanbul high-speed line project will contribute to the renovation and doubling the tracks of a section of the existing conventional line.
GENERAL DIRECTORATE OF TURKISH STATE RAILWAYS
1st REGIONAL DIRECTORATE, DEPARTMENT OF PROCUREMENT
BAYIRKOY STATION RELOCATED LINE
INFRASTRUCTURE CONSTRUCTION WORK
CONTRACT VALUE: $ 1.330.045
An accelerated renovation has been carried out at Bayırkoy Station in Arifiye-Inonu single track line section with an approximate length of 150 km on the existing conventional line between Ankara-Istanbul. This line has an economical importance. Briefly, Ankara-Istanbul high-speed line project will contribute to the renovation and doubling the tracks of a section of the existing conventional line.
CSK CONTRACTING, TECHNOLOGY, CONSULTING AND COMMERCIAL INCORPORATED COMPANY has undertaken route and borrow excavation, loading, transportation and laying,
compression, route filling, rock filling and subgrade construction, culvert and engineering structure construction works within this project.