ASIAN SIDE OF NORTH MARMARA MOTORWAY

ASIAN SIDE OF NORTH MARMARA MOTORWAY

IC ICTAS CONSTRUCTION

CONSTRUCTION WORKS ON PASAKOY-HUSEYINLI-KOMURLUK ROUTE ON ASIAN SIDE OF NORTH MARMARA MOTORWAY

IC ICTAS CONSTRUCTION

3Rd Bosphorus Bridge

An 8-lane highway and a 2-track railway line pass through the 3rd Bosphorus Bridge, which constructed by a team mainly composed of Turkish engineers.

3Rd Bosphorus Bridge

3rd Bosphorus Bridge, which is the Trail-Blazing Bridge, has become the broadest and longest suspension bridge of the world with a width of 59 meters and a main span of 1408 meters and a rail system on it. Another unique aspect attributed to the bridge is that it is a suspension bridge, which has the highest tower over 322 meters.

Northern Marmara Motorway

115 km of the North Marmara Motorway with 19 junctions and connection roads is included within the scope of Odayeri – Pasakoy section of the project.

Northern Marmara Motorway

This motorway project was built in order to reduce the traffic load of the existing 1st and 2nd Bosphorus Bridges and solve the transportation problem of Istanbul.

IC ICTAS CONSTRUCTION

CONSTRUCTION WORKS ON PASAKOY-HUSEYINLI-KOMURLUK

ROUTE ON ASIAN SIDE OF NORTH MARMARA MOTORWAY

CONTRACT VALUE: $ 10.951.000


3Rd Bosphorus Bridge

An 8-lane highway and a 2-track railway line pass through the 3rd Bosphorus Bridge, which constructed by a team mainly composed of Turkish engineers, and provide great engineering and state-of-art work. 3rd Bosphorus Bridge, which is the Trail-Blazing Bridge, has become the broadest and longest suspension bridge of the world with a width of 59 meters and a main span of 1408 meters and a rail system on it. Another unique aspect attributed to the bridge is that it is a suspension bridge, which has the highest tower over 322 meters.


Northern Marmara Motorway

115 km of the North Marmara Motorway with 19 junctions and connection roads is included within the scope of Odayeri – Pasakoy section of the project. Odayeri-Pasakoy section of this motorway project was tendered on 20.04.2012 with Build-Operate-Transfer model in order to reduce the traffic load of the existing 1st and 2nd Bosphorus Bridges and solve the transportation problem of Istanbul and completed within 2016. Within the scope of motorway project including 3rd Bosphorus Bridge, CSK CONTRACTING, TECHNOLOGY, CONSULTING AND COMMERCIAL INCORPORATED COMPANY has successfully completed excavation on all types and classes of ground, cutting and side borrow-cutting on all types and classes of ground and utilisation, blasting, loading, transportation and laying, compression works

y