Within the scope of the project, art structures and earthworks were successfully completed by CSK.
In the general framework of the project with a length of 88 Km
56 million m3 excavation and 27 million m3 filling work carried out. Also, throughout the route, 3 tube tunnels, 9 viaducts, 34 bridges and other engineering works on versatile sizes and numbers are available
The total length of the tunnels, as left and right tubes, reaches up to 11,000 m and the length of the viaduct on both directions is about 8,000 m.
The traffic of Istanbul and Marmara integrated with transit connection through the project, and it makes a great contribution to the export capacity of Turkey.
KM: 0+000-39+500
CONTRACT VALUE: $ 20.475.000
North Marmara Motorway
In the general framework of the project with a length of 88 Km, 56 million m3 excavation and 27 million m3 filling work carried out. Also, throughout the route, 3 tube tunnels, 9 viaducts, 34 bridges and other engineering works on versatile sizes and numbers are available. The total length of the tunnels, as left and right tubes, reaches up to 11,000 m and the length of the viaduct on both directions is about 8,000 m. The traffic of Istanbul and Marmara integrated with transit connection through the project, and it makes a great contribution to the export capacity of Turkey.
In this grand motorway project, CSK CONTRACTING, TECHNOLOGY, CONSULTING AND COMMERCIAL INCORPORATED COMPANY. has successfully completed excavation on all types and classes of ground, cutting and side borrow-cutting on all types and classes of ground and utilisation, blasting, loading, transportation and laying, compression and construction of engineering structures.